28 - 30 May, 2018
Rio Othon Palace Hotel, Rio de Janeiro, Brazil

Daniel Figueiredo

Operations Manager/Deputy Director FPSO Pioneiro de Libra
TK Ocyan

Daniel Figueiredo has over ten years of experience in Oil and Gas Industry, including FPSO operations and FPSO upgrade projects in Brazil as well as Conversion projects in Singapore.

Starting as an operations engineer in Teekay his current role is Operations Manager for the FPSO Pioneiro de Libra within TK Ocyan, a joint venture between Teekay and Ocyan that also Operate the FPSO Cidade de Itajaí which Daniel acted previously as Operations Manager. Daniel has also taken the role as Preparations for Operations Manager for both Libra and Itajaí projects and Deputy Project Director for Pioneiro de Libra project.



5:30 PM Case-Study: Successful Delivery of FPSO Pioneiro de Libra Using an EPC Lump Sum Model

After an investment of more than USD1bn and 4,000 people over a period of two years, the FPSO Pioneiro de Libra left Singapore’s Jurong Shipyard in March 2017 for Brazil, where it will be the first FPSO to produce oil from the country’s Libra Block, one of the largest pre-salt oil reserves in the world. This session will discuss the key learning points that could be learnt from the entire EPC process, the main challenges the company faces during the entire project, and how it managed to innovate to solve some of these issues.


Check out the incredible speaker line-up to see who will be joining Daniel.

Download The Latest Agenda